As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
Cedar shingle roof installation guide.
Return to all blogs.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
Click on the below links to view the full application instructions for.
How to install a cedar shingle roof on a garden shed step 1.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Check the felt paper.
The jb western red cedar shingles from marley are a lightweight roofing and cladding solution with a high degree of natural thermal insulation.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
Cedar shingle application cedar shake application.
This document will help you with the installation of your cedar shake and shingle roofs.
Cover the roof with roofing felt.
The shingles shall be spaced 6mm apart and be nailed or stapled twice the nails staples should be fixed 19mm in from the edge and 38mm above the butt of the course above.
Shake shingle roof application instructions feb 10 2017.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
Looking for a dealer in your area.
A guide to installing cedar shingles.
Secure it to the.
To ensure you are reading the latest edition of the roof manual please contact our office.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.
Flashing intercepts and directs the flow of water away from the building to designed drainage paths.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Joints in any one course should have a side lap of no less than 38mm from the joint in adjacent courses and in any 3 courses no 2 joints should align.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.